Prosolia Energy has finished the construction of a 1886,08 kWp renewable solution on the rooftop of Gresart Ceramica HQ in Portugal.

This photovoltaic installation, in which Prosolia Energy has carried out the development, engineering and construction, has more than 5.890 modules through which Gresart will obtain 2.765 MWh / year of energy generated from a renewable source.

Furthermore, with this renewable solution (which has been promoted by Helexia Portugal) Gresart will have a positive impact on the environment avoiding the emission into the atmosphere of 1244 tons of CO2 per year.

Visit our website and take a look at our renewable solutions: